Mumbai - Ahmedabad High Speed ​​​​​​Rail Information, route map, fares, offers and updates (2023)

Menu:|Mumbai – Ahmedabad HSR|Deli - Varanasi HSR|Delhi-Ahmedabad HSR|Bombay - Nagpur HSR|Deli – Amritsar HSR|Bombaim – Hyderabad HSR|Chennai-Mysore HSR|Varanasi – Howrah HSR

Information

The Mumbai - Ahmedabad High Speed ​​Rail (MAHSR Bullet Train) project is a 508.17 km high-speed rail line under construction that will connect Mumbai, Maharashtra to Ahmedabad, Gujarat through 12 stations at an estimated cost of Rs. .1,1 crores(15 billion US dollars).

(Video) Delhi-Ahmedabad BULLET Train ROUTE & STATIONS | Delhi-Mumbai BULLET Train 🇮🇳

The project is being carried out by National High Speed ​​Rail Corporation Ltd. (NHSRCL) under a 50-year contract.88.087 crores($12 billion) loan from Japan at an interest rate of 0.1%,with repayments scheduled to begin 15 years after the line goes into operation.

The first section of the Mumbai-Ahmedabad Bullet Train project in Gujarat is due to open in 2026.

  • current project deadline: December 2023
  • my cherished conclusion: 2030

The line's trains will operate at a speed of 320 km/h on an elevated viaduct 10 to 15 m above the ground, except in Mumbai where the line will be built underground using3 mega tunnelers(TOO). Between Mumbai and Thane stations, the line will run under the sea at Thane Creek for approximately 2 km.

(Video) Bullet Train Project Update in INDIA/Mumbai-Ahmedabad High speed rail corridor update/Latest 2022

The line's rolling stock will consist of Shinkansen E5 trains that are capable of operating at a maximum speed of 350 km/h (220 mph) with operating speeds of 320 km/h (200 mph).

The first stone of the project wasestablishedby the Prime Ministers of India and Japan on September 14, 2017, after which constructionwork startedfor a 4,000-employee High Speed ​​Train Training Institute (HSRTI) in Vadodara. youThe Indian government has set a deadline of 15 August 2022, but it will not be met due to land acquisition issues (825 hectares needed), mainly in the state of Maharashtra.

Operational:0km| Under construction:324,67 km| Approved:183.501km

High:468 kilometers| Underground:27 km (2 km under the sea at Thane Creek)| For grade:13 kilometers

Project cost: Rs.1,1 crores

Standard / Financing Sources

  • Government. of Japan (JICA): Rs. 88.000 crores
  • Indian government: Rs. 17.000 crores
  • Governments of Maharashtra and Gujarat: Rs. 5000 crores

Bullet train route information

  • Length:508.17 kilometers
  • Type: elevated, underground and level
  • Deposits: Sabarmati Railway Station, Surat Railway Station and Thane Railway Station
  • number of stations: 12
  • Station names:Mumbai (Complejo Bandra Kurla), Thane, Virar, Boisar, Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand/Nadiad, Ahmedabad and Sabarmati

System specs

  • Maximum speed: 350 km/h
  • operating speed: 320 km/h
  • Average speed: 250 km/h
  • track width: Standard width - 1435 mm
  • Signaling: Continuous Automatic Train Control (DS-ATC)
  • rolling stock: 24 trains x 10 wagons
  • train capacity: 750 passengers
  • Traction: Catenária aérea 2 x 25 KV CA (OHE)
  • Security: Urgent Earthquake Detection and Alarm System (UrEDAS) for automatic braking in the event of an earthquake
  • Power supply: 12 traction substations, 2 storage substations and 16 distribution substations

Project overview video

Bullet Train Operational Plan

The line's Operational Control Center (OCC) will be located in Sabarmati. The trains will be operated with 2 types of passenger services:

(Video) Mumbai Ahmedabad Bullet Train 2019 | Stations Route Alignment

  • High Speed ​​(2.58 hours of travel):Ahmedabad (Sabarmati) – Ahmedabad (Kalupur) – Anand – Vadodara – Bharuch – Surat – Bilimora – Vapi – Boisar – Virar – Thane – Mumbai (Complejo Bandra Kurla)
  • Fast high speed (2.07 hour trip):Ahmedabad (Sabarmati) – Vadodara – Surat – Mumbai (Complejo Bandra Kurla)

bullet train route map

The alignment and location of the stations shown below are indicative only to give you an idea of ​​what the line would look like.

HSR Mumbai - Ahmedabad line official PDF route map will be added here when available.

Current status of the project

The first section of the Mumbai-Ahmedabad Bullet Train project in Gujarat is due to open in 2026.

Construction of the accommodation buildings at the Vadodara Training Center has been completed and the Sabarmati HSR Terminus Station is underway. Concreting work on the foundations of the main linestarted on February 10, 2021.

Construction is ongoing on 5 civilian packages within Gujarat: C4, C5, C6, C7 and C8. See package details in the Contractor section below.

(Video) Mumbai Ahmedabad Bullet Train|All Stops and Route| [Updated 2021] मुंबई अहमदाबाद बुलेट ट्रेन

Fares Mumbai – Ahmedabad HSR (Prices)

The rate structure has not yet been finalized but is expected to be 1.5 times the existing First Class AC rate on current Indian Railways service. It is expected that the fare structure, pricing and official rules for the line will be finalized closer to the start of commercial operations.

Mumbai – Ahmedabad HSRTenders

Latest NHSRCL Mumbai - Ahmedabad High Speed ​​Rail tender notices can be viewed at NHSRCL'ssite web. News about these listings, their bidders, bids and awarded contracts are covered in more detail in the.

Mumbai - Ahmedabad Prime HSR Contractors

Contractcontractor
feasibility studyJICA – Ministry of Railways (RVNL) JV
CG: General Consultant MAHSRJapan International Consultants for Transportation Co., Ltd. (JIC) – Nippon Koei Co., Ltd. – Oriental Consultants Global Co., Ltd. JV
PMC: MAHSRA Project Management ConsultantTata Consulting Engineers – Consulting Engineers Group – Aarvee Associates – PADECO Co. JV
Geotechnical Investigations Using Well Drilling and Plate Load TestingK.C.T. Consulting services
Geotechnical investigation of a 2km underwater section in Thane CreekKawasaki Engineering Geology – RITES
Design and Execution of Housing Construction Works (Phase – I) of the Training InstituteCube Building Engineering Limited
Construction of accommodation, offices, outbuildings and other miscellaneous works at the Lalbaug Vadodara campus of the National Railway Academy of IndiaJ.R. Construction
Construction of various building structures in Vadodara Yard and nearby areasVijay Agarwal and associates
Project and Works for the Construction of the HSR Terminal in SabarmatiBL Kashyap & Sons Ltd. .
package C1: 1028 km BKC Metro Station, MumbaiMEIL – HCC JV is the highest bidder
C2 package: 20,377 km underground tunnel between BKC station and Shilphata, Thane (3 mega tunneling machines to be used)
package C3: linha elevada de 135.450 km entre Shilphata, Thane e Zaroli Village (frontera MH/GJ)Invited offers in November 2022
C4 package: 237.1 km of elevated line between Zaroli Village (MH/GJ border) and Vadodara
C5 package: 8,198 km elevated viaduct and station within Vadodara
C6 package: 87,569 km elevated viaduct between Vadodara and Ahmedabad
C7 package: 18,133 km elevated viaduct and station within AhmedabadIRCON – DRA JV
C8 package: 2,126 km viaduct, work on the Sabarmati DamSCC-VRS JV
D1 package: Thane depot, including civil works, construction works, inspection sheds, maintenance and installation depot, testing and commissioning of maintenance facilitiesbidding in progress
pacote D2: Sabarmati depot comprising workshop, inspection sheds, various buildings, maintenance facilities and associated works
Package P1(a): Construction of 1 PSC bridge and 10 steel truss bridges between Shilphata and ZaroliPending Tender Notice
Package P1(b): Construction of 4 PSC bridges and 7 metal bridges between Zaroli and Vadodara.MG Contractors is the highest bidder
Package P1(c): Construction of 1 PSC bridge and 4 steel truss bridges between Vadodara and Ahmedabad.MG Contractors is the highest bidder
P2 package: Construction of bridge PSC No. GAD 10 on NH48, Navsari district.Invited Tender August 2019
P3 package: Construction of bridge PSC No. GAD 11 on NH48, Navsari district.Invited Tender August 2019
pacote P4: Acquisition of Metallic Structures, Manufacture and Supply of Metallic Structures (Truss) of various sizes in workshops, to be erected by the packages of Special Bridges P-1(A), P-1(B), P-1(C) .
T1 package: Design, Supply and Construction of Track & Track Related Works between HSR Station in BKC/ Mumbai and Zaroli Village in MH/GJ Border (156,855 km)Pending Tender Notice
T2 package: Design, supply and construction of roads and related works between Zaroli Village and Vadodara (237.10 km)IRCON International
T3 package: Design, supply and construction of rails and rail-related works between Vadodara and Sabarmati Depot and workshops (114.60 km)

Click 'Build News & Updates' below for project news, progress and updates.

Menu:|Mumbai – Ahmedabad HSR|Deli - Varanasi HSR|Delhi-Ahmedabad HSR|Bombay - Nagpur HSR|Deli – Amritsar HSR|Bombaim – Hyderabad HSR|Chennai-Mysore HSR|Varanasi – Howrah HSR

Last updated page:February 9, 2023. Have a question or found a bug?let me know here.

FAQs

What is the fare of Mumbai-Ahmedabad bullet train? ›

At present, the First AC fare between Mumbai and Ahmedabad is somewhere between Rs 2,000 to Rs 2,400, depending on trains.

What is the status of Mumbai-Ahmedabad bullet train project? ›

Dream project to be completed by 2026

National High-Speed Rail Corporation Limited (NHSRCL) has already floated technical bids for the construction of the 21-km tunnel, 7 km of which will be under the sea. The mega project is likely to be completed by 2026.

How much does 1 km of high speed rail cost? ›

“Very high-speed” is not needed everywhere. High-speed rail infrastructure is expensive: on average, the lines we audited cost 25 million euro per km (not taking into account the more expensive tunnelling projects), with the overall costs for the BBT as high as 145 million euro per km.

Which train ticket is costly? ›

Most Expensive Train In India: The Maharaja Express is the most luxurious and expensive train. The ticket for riding on this train can cost you more than 19 lacs. The Maharajas' Express recreates that exclusive experience for its guests. A person can choose between four routes to travel for seven days on this train.

Is food free in Tejas Express Mumbai to Ahmedabad? ›

High-quality food and beverages will be provided to the passengers on board in the train and included in the ticket fare.

When Mumbai-Ahmedabad bullet train will start? ›

Senior BJP leader and Rajya Sabha member Sushil Kumar Modi Saturday said that the bullet train project connecting the cities of Mumbai and Ahmedabad will be completed by August 2026 as the change in governance in Maharashtra has “removed the obstacles” in land acquisition.

Does bullet train have toilet? ›

All long distance trains, including commuter style long distance trains have toilets.

Which state will get India's first bullet station by 2024? ›

The correct answer is Surat. Surat is set to have its own bullet train station. It is scheduled to be completed by December 2024. The bullet train station will be the first one built along the Mumbai-Ahmedabad route.

Is high speed rail cheaper than flying? ›

Sure, you could fly, but once you factor in traveling to the airport, going through security, and sitting on a taxiway, the high-speed train is still faster. It would also be cheaper. A lot cheaper. That high-speed train ticket would cost about $75, compared to more than $200 to fly or drive.

Is high speed rail expensive? ›

The Little Engine That Couldn't: California's High-Speed Rail Costs Rise To $200 Million Per Mile. California's high-speed rail (HSR) pencils out to around $200 million per mile for the San Francisco–Los Angeles route. And this cost is almost certainly too low if the main attraction of the project is ever built.

How much would a high speed rail cost in the US? ›

The High-Speed Rail Authority promises travel time under 3 hours, a construction cost of about $33 billion, and trains operating by 2030.

Which is best seating in train? ›

Generally lower one is preferable. If you want to lye down most of the time during the journey, you should opt for the upper one. In 3 tier, there will be a middle berth in between upper and lower.

Which is the cheapest luxury train in India? ›

Majestic tourist trains and Buddha Express are the cheapest luxury train in India.

What is the most expensive train ticket from Mumbai? ›

Tickets for the Maharajas' Express can cost up to Rs 20 lakh for a six-night journey if the presidential suite is chosen. Indian Railways, besides being the largest rail network in Asia, also provides luxury train experience to its passengers.

Is meal free in Tejas? ›

Passengers travelling in the Tejas Express will have to pay ₹205 instead of ₹155 for breakfast meal and ₹155 instead of ₹105 for evening snacks. For Lunch and dinner during the travel, passengers will require to pay ₹294 instead of ₹244 if the passengers did not opt for the meal during the booking of the ticket.

Is water bottle free in Tejas Express? ›

Each coach will be provided with RO water filter in addition to the packaged drinking water bottle for each passenger,” an official release from IRCTC said. The railways has allotted two Tejas rakes to run them on Delhi-Lucknow and Ahmedabad-Mumbai routes.

Is food free on Tejas? ›

Included in the ticket. (With an option of excluding it for a reduced ticket price). But the spread is yum and is served by a butler in both classes (Chair cars and one Executive class, more like a First Class). Tea/coffee, breakfast, snacks and lunch/dinner keep coming one after the other.

How much does it cost to ride a bullet train? ›

330, 530, 730 or 930 yen depending on the date of travel. An additional supplement (100-620 yen depending on distance traveled) applies for using reserved seats on Nozomi, Mizuho, Hayabusa and Komachi trains.

How much would it cost to ride a bullet train? ›

Shinkansen – The Bullet Train

A 7 day consecutive pass that covers all trains (excluding the Nozomi and Mizuho Shinkansen) will cost 29,110 Yen (ca. 291 USD), a 14-day pass 46,390 Yen (ca. 463 USD) and a three-week pass 59,350 Yen (593 USD). As a one-way ticket to Kyoto will set you back at least 10,100 Yen (ca.

How much did bullet train cost? ›

The R-rated “Bullet Train” didn't come cheap, so it's a good thing the movie managed to remain a big-screen draw throughout the fall. Sony spent $90 million to produce the film, plus the tens of millions to promote it.

How much will the Texas bullet train cost? ›

What will the project cost? The civil infrastructure costs (or hard costs) for the project will be around $20 billion, which includes the construction of the lines, tracks, viaducts, berms, maintenance facilities, power sub stations and three passenger stations.

Can you sleep on the bullet train? ›

These trains allow you to travel quickly overland, arriving at your destination by the following morning. Also, you will be able to sleep while you travel, more comfortably than on an airplane or an overnight bus.

Can you walk around on a bullet train? ›

There's more than enough legroom, and reclining the seat won't bother the person behind you. You can stand up and walk around to stretch your legs, or just to get a better view out one of the windows.

Will the US have bullet trains? ›

As of 2023 the California High-Speed Rail Authority is working on the California High-Speed Rail project and construction is under way on sections traversing the Central Valley. The Central Valley section is planned to open in 2029 and Phase I is planned for completion in 2033.

Does the US use bullet trains? ›

Despite efforts dating back to 1965, the United States has yet to complete a high-speed rail line. Three projects are underway, however. A group of 10 senators and 65 House members this spring asked for $3.5 billion in fiscal year 2023 appropriations to develop high-speed rail corridors.

Why does the US not use bullet trains? ›

Population Density. The US simply does not have the density to have the need for high speed rail. There are a few regions where this is actually a viable thing, and one region in the US already has a high speed rail line, called the Acela Express. It runs from Boston, Massachusetts to Washington, DC.

How much is Brad Pitt paid for bullet train? ›

These days, we're looking at up to US$30 million per acting credit for Mr Pitt, with his latest film Bullet Train netting him US$20 million, as per Screen Rant.

Who is the owner of bullet train? ›

It is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India.

Which country is funding bullet train in India? ›

This Japan-India collaboration will ensure Transfer of Technology from Japan's High Speed Rail system to India, and also give a boost to "Make in India" initiative." JICA has been supporting the project for the Mumbai - Ahmedabad High-Speed Rail by providing ODA loans.

Does Florida have a bullet train? ›

Brightline, an ecofriendly, high-speed train company, has been changing how people live, work, and play in south Florida since it launched its first high-speed train service in 2018 between Fort Lauderdale and West Palm Beach. Soon after, it expanded to downtown Miami.

Is Florida getting a bullet train? ›

Florida's modern high-speed train line, Brightline, is adding two new stations to its South Florida network just in time for winter travel season. Starting Dec. 21, Aventura and Boca Raton will join Miami, Fort Lauderdale and West Palm Beach to create a five-stop train route.

Is Texas building a bullet train? ›

The railway, which will be 380 kilometres long, will transform mobility between two U.S. cities with strong population growth. The high-speed train will link Dallas and Houston in 90 minutes with a train every 30 minutes at peak times. There will be one stop in the Brazos Valley, where Texas A&M University is located.

Videos

1. Mumbai-Ahmedabad Bullet Train : Route | Cost | Specialities | All you want to know
(GSTV NEWS)
2. Mumbai -ahmadabad high speed RAIL PROJECT update II Route ,capicity all station construction ,fund
(technical viru)
3. Bullet Train in India - Why Mumbai Ahmedabad High Speed Rail Corridor project is stuck? UPSC GPSC
(StudyIQ IAS)
4. Mumbai Ahmedabad Bullet Train Project or High Speed Rail Project
(Droneman)
5. MUMBAI HYDERABAD BULLET TRAIN: Info and Route ( 2022) (updated)
(Route_link)
6. Mumbai Ahmedabad Bullet train Latest update || Mumbai Ahmedabad Bullet train Construction Update.
(Kuldeep ke Vlogs)
Top Articles
Latest Posts
Article information

Author: Madonna Wisozk

Last Updated: 04/11/2023

Views: 5475

Rating: 4.8 / 5 (68 voted)

Reviews: 91% of readers found this page helpful

Author information

Name: Madonna Wisozk

Birthday: 2001-02-23

Address: 656 Gerhold Summit, Sidneyberg, FL 78179-2512

Phone: +6742282696652

Job: Customer Banking Liaison

Hobby: Flower arranging, Yo-yoing, Tai chi, Rowing, Macrame, Urban exploration, Knife making

Introduction: My name is Madonna Wisozk, I am a attractive, healthy, thoughtful, faithful, open, vivacious, zany person who loves writing and wants to share my knowledge and understanding with you.